Lim, Jun Yek (2016) Performance Optimization of Rooftop Power Plant in Malaysia Climate by Lowering Down the Temperature. Final Year Project, UTAR.
| PDF Download (1306Kb) | Preview |
Item Type: | Final Year Project / Dissertation / Thesis (Final Year Project) |
---|---|
Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering |
Divisions: | Lee Kong Chian Faculty of Engineering and Science > Bachelor of Engineering (Honours) Electrical and Electronic Engineering |
Depositing User: | Sg Long Library |
Date Deposited: | 09 Feb 2019 16:50 |
Last Modified: | 09 Feb 2019 16:51 |
URI: | http://eprints.utar.edu.my/id/eprint/3130 |
Actions (login required)
View Item |